Employment Opportunities

Friday, March 23, 2012

Greens Update

The greens are recovering very well from aerification.  The picture below was taken on Thursday morning.  They are still a little bumpy and only rolling in the 8 1/2 to 9 range, but they are making huge strides every day.  We will continue to work the height of cut down as they progress.


Monday, March 12, 2012

Spring Greens Aerification

We began our spring greens aerification on March 5, one week ago today.  We were blessed with good weather for most of the week and things went very well.  As we do most years, we tweaked the process a little this year...

We started out by core aerifying with .5" inside diameter tines on a 1.60" by 1.87" spacing, which allowed us to remove approximately 6.59% of the surface area of the greens.

  a green immediately after core aerification and cleanup

Following the core cleanup, we topdressed the greens very heavy and brushed them one time with a pull behind brush.  After that we aerified again, with .5" solid tines this time, on a 2" by 2.5" spacing, which impacted approximately 3.93% of the surface area.  We were able to achieve over 4.5" of depth with the solid tines, which allowed us to create channels 2" deeper into the greens profile than we did with the coring tines.  The picture above was taken following the solid tine aerification.

Following the solid tine aerification, we used shop brooms to filter the sand down into the channels that were created.  Filling the channels with sand helps the soil retain air space, which is important in the movement of air, water, and gases in the soil profile.

After we finished hand-brooming greens, we made a pass over them with the pull behind brush to help even the sand on the surface.  We are very pleased with the finished product!

Tuesday, February 28, 2012

Twenty Eleven Video

The Twenty Eleven video made its debut at the annual Greystone Employee Luncheon yesterday to rave reviews! Here it is for all to see... Enjoy!






Friday, February 24, 2012

#18 Project Completion (almost!)

We were blessed with good weather the past 17 days, which played a huge roll in us completing the project as quickly as we did.  The cart path has been replaced, the irrigation lines have been repaired, and all the sod work has been completed.  We will leave the ropes up to keep cart traffic off until the ground firms up and the sod knits together.  The area will play as "ground under repair" for the next couple of months or so.  Also, we will be topdressing the area several times this summer to help smooth it out.

We are very grateful to have this completed!  Thank you for the patience that you extended us throughout this project!


sod being layed and irrigation lines being repaired


Kevin putting the finishing touches on the cart path


the dirt pile in the woods to the left is in the process of being removed


looking like a golf hole again!

Friday, February 17, 2012

#18 Project Update (Friday afternoon)

Most of the backfilling and grading is now complete and almost all of the fairway has been re-sodded.  Early next week, our goal will be to complete the sod work and replace the sections of cart path that we had to remove to replace the pipe.  Also, we will be doing a lot of touch up on the sod that we put in the fairway as most of it was laid very quickly Tuesday afternoon in an effort to beat the rain.  The plastic that you see in the picture below was put down this afternoon in an effort to keep the area in the rough that we still have to sod as dry as possible with heavy rain forecasted for tomorrow.  The hole has been playing as a par 5 again since Wednesday afternoon.